The original porch that will be removed and the addition will replace it.
|
|
Some of the walls have been put up along with the new roof rafters. The large hole in the wall is where the doors will go.
|
 |
The new double French doors will be the main entrance from the back yard into the addition.
|
 |
The doors have been capped off and the siding has been installed. The contrast between the two add a nice look to the house.
|
 |
The original back of the house will be resided and new windows will be installed on the lower part of the house.
|
 |
The siding is almost finished. Even the existing part of the house will be Tyvek'ed before the siding is installed.
|
 |
The finished picture of the existing part of the house.
|
 |
The new windows were custom made to fit into the existing masonry.
|
 |
A new concrete patio has been poured outside of the double French doors. The owners opted for a larger step down to the patio.
|