|
|
The bricks that will be used to build the foundation of the addition.
|
|
The dirt that has been dug out for the foundation.
|
 |
The bricks then need to be moved into the hole dug for the foundation.
|
 |
Here is the pit that was dug for the run off of rain water.
|
 |
Once the pipe has been run, it is covered over and will be back filled.
|
 |
The PVC pipe that connects to the rain gutters of the addition and existing gutter system.
|
 |
After the pipe is installed, the dirt is pushed back over and is used to cover up the holes that were dug.
|