The original tile floor.
The tile is ripped up to expose the sub floor.
The length of the basement had to be removed.
Some of the wall has been removed as well.
The joist are rotted.
The concrete floor above will have to be removed to get to the leak.

 

back

Send mail to RJFries@rjfries.com for questions and comments about this site.
Copywrite © 2004-2008, R.J. Fries & Sons, Inc.