|
 |
The floor after it has been striped down to the concrete.
|
 |
The tracking that will help hold up the frames of the walls is put down.
|
 |
Here you can see the framing of the walls going up.
|
 |
The wall has been put up and the insulation process has started
|
 |
Some of the walls have been dry walled while others are still getting insulated
|
 |
The walls have been covered and you can see where the door and windows will be.
|
 |
Two corner sliding glass windows in the finished waiting room.
|
 |
A finished version of the picture two pictures up.
|
 |
A side door that will allow customers to enter the waiting room.
|