The original space where the bathrooms will be. |
 |
A trench has been cut into the concrete to allow room for the piping to be installed. |
 |
The piping has been run and the trench has been filled in with stone to allow the pipes some breathing room.
|
 |
The trench has been sealed with concrete and the frame of the wall has been put up.
|
 |
Here you can see some of the drywall up along with the frame for the dividing wall.
|
 |
Here you can see the walls have been covered and the ceiling is in.
|
 |
A nice shot of the outside of the bathroom. Look below for a finished picture.
|
 |
The door frames have been installed and the doors are hung. You can see the nice shade of blue that runs throughout the office.
|
 |
The complete finished bathroom. With stalls a sink and retro style tile flooring to match the rest of the building.
|