The original space where the bathrooms will be.
A trench has been cut into the concrete to allow room for the piping to be installed.
The piping has been run and the trench has been filled in with stone to allow the pipes some breathing room.
The trench has been sealed with concrete and the frame of the wall has been put up.
Here you can see some of the drywall up along with the frame for the dividing wall.
Work done on building 12
Here you can see the walls have been covered and the ceiling is in.
Work done on building 12
A nice shot of the outside of the bathroom. Look below for a finished picture.
Work done on building 12
The door frames have been installed and the doors are hung. You can see the nice shade of blue that runs throughout the office.
Work done on building 12
The complete finished bathroom. With stalls a sink and retro style tile flooring to match the rest of the building.

 

 